Monday, June 14, 2010
Framing Update
We have been working on framing the second floor walls and will soon move on to the roof rafters. This attached photograph is looking from the concrete wall upwards towards the south facing dormer. As you can see mostly all of the dormer wall will be glazing which will allow maximum winter solar radiation to enter. You can also see the cat walk we built in front of these windows, which is accessible from the second floor loft area. This cat walk will provide an easy and safe access for the home owners to open and close these windows for natural ventilation purposes during the summer time.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment