Thursday, June 3, 2010
Second Floor Framing Joists
We have placed the exterior sheeting around the house to make it more stable and keep everything plumb and square. After this the floor joists have begun to roll out and we will soon be building the second floor walls. In the next post I will explain how we have dealt with the rim joist and sheeting connection to prevent air and vapor leakage.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment