Monday, August 30, 2010
House Update
Everything has been coming together nicely at Beagle Brook, we have built to lower roof the both protects and shades the first floor windows. The rear entry connector is built between the house and the existing barn and the furring strips for the siding are installed. We are prepping the inside so the spray foam application can begin and gearing up for the installation of the siding and roof finish material. Stay tuned for the finishes.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment