Wednesday, August 11, 2010
Interior Framing Update
On the interior of the house we have been getting everything together so the spray foam contractors can come in and insulate the house. Rigid foam has been placed in all the headers and sealed with caulk around the edges. The rest of the interior framing has been built on top of the concrete floor. The oak stair way has been built and temporarily dropped into place. Along with the framing we have installed all the necessary blocking so that grab bars will be able to be installed throughout the master bathroom at a later date. This house has been designed to be not only passive solar, but also with the ideals of aging-in-place.
Subscribe to:
Post Comments (Atom)
Lookin things are coming along fellas. Nice Work!